STEP 02 OF 04

Smart Home Installation & Integration

Infrastructure is the invisible foundation on which everything else depends.

Most problems with smart homes do not come from poor devices. They come from the lack of a design.

We design and build interconnected systems for lighting, HVAC, motorization, security, multimedia, and more, based on low-voltage and IT infrastructure. All of these systems are unified within a centralized control platform for seamless management.

Installation scope

What you get

The physical infrastructure Aktakon builds - cabling, switchboards, network equipment and preparation for every subsystem.

KNX low-voltage cabling

Installation of the KNX bus and power cables for all control subsystems - lighting, blinds, HVAC, security. Every cable is documented and labelled.

IT and network infrastructure

Structured cabling, Wi-Fi access points, server rack and equipment. The network is designed for today's needs as well as tomorrow's.

Switchboards

Installation and wiring of low-voltage switchboards with KNX actuators, power supplies and controllers. Distribution by floor and zone.

HVAC infrastructure

Cabling for thermostats, floor sensors, fan coil control and heat recovery ventilation. Coordination with the HVAC subcontractor.

Security and video surveillance

Cabling for cameras, the intercom system, access control and the alarm panel.

Multimedia infrastructure

Cabling for in-wall speakers, home cinema and multi-zone audio.

Как работим

The four phases of installation

From site preparation to infrastructure handover - four phases with a clear sequence and documentation.

Phase 01

Site preparation

Review of the design documentation and coordination with the electrical engineer and the construction team. Defining and planning the exact positions of cable routes and switchboards.

Phase 02

Cable installation

Physical installation of all low-voltage and power cables. Labelling and testing of the entire low-voltage electrical installation and preparation of as-built documentation.

Phase 03

Switchboard and equipment installation

Installation of KNX devices, power supplies, network equipment and control modules in the switchboards.

Phase 04

Testing and handover

A full test of the infrastructure. Every control point in the home is checked. Handover of as-built documentation with cable schedules and drawings.

Производители и Технологии

Manufacturers and technologies we work with

The technologies and systems we design and integrate as part of this service - open standards, proven in practice.

On/Off Lighting
DALI Lighting Control
HVAC
Video surveillance
Shutters and Blinds
Motorized curtains
Home Theatre
Multiroom Integration
Leakage sensors
Motorized Gate and Garage Doors